Fairbanks Gold Mining, Inc. (A Kinross Company) operates an open-pit gold mine located northeast of Fairbanks, Alaska. A haul road grade separation was needed to more efficiently transport ore to their new gravity heap leach facility. 

Battling some of the heaviest live loads and a short summer construction schedule, AIL MINING designed and fabricated a Super•Cor haul road grade separation over an existing access road to keep the project on track. 

» Learn more about Super•Cor

Project-at-a-glance


Scope:
Haul Road Grade Separation 

  • Super•Cor: 45'-9" span x 20'-11" rise x 265' long
  • Hitachi EX5500-6 Mining Shovel live load, operating weight of 1,151,000 lbs. 
  • CAT 793F Mining Truck live load 
  • CAT 994F Wheel Loader live load

Owner: Fairbanks Gold Mining, Inc. (A Kinross Company) 
Engineer: USKH, Inc. 
Project Manager: Merit Consultants International, Inc. 
Contractor: Alaska Aggregate Products, LLC 