Home » Projects » Bridge/Abutment Packages barge in to remote Alaskan site

Bridge/Abutment Packages barge in to remote Alaskan site

modular-steel-bridges-stream-crossing

The Kensington underground gold mine and associated milling facilities are located in the remote Berners Bay Mining District, about 45 miles northwest of Juneau. The site, which is only accessible by water or air, had two failing stream crossings in need of replacement. 

mining-truck

AIL Mining and Big R Bridge were awarded the contract to design and supply two Modular Bridge and Bolt-A-Bin Abutment Packages to support AD45B underground articulated truck loading. The packages needed to be barged into the site, which was no problem for our modular systems that are ideal for shipping to remote sites.

Bridge/Abutment Packages install in a week
When Kensington was initially being developed in 2009-10, AIL Mining / Big R Bridge had previously provided two prefabricated bridges for other locations at this mine site. 

bridge-abutment-mining  mining-road-steel-bridge-replacement

The owner had to comply with US Forest Service requirements, some of which were not known at the outset of the contract. We provided several re-designs of the structures and abutments along the way and we stayed engaged with both the owner and their consultant to keep the project on schedule. The two crossings, one 65' and one 45' were installed in a week and no concrete was required.

An AIL Mining Representative has since visited the site and the owner is very pleased with how the project turned out.

Related article:

Bridge provides access to Alaskan mine reclamation »

Project at a glance:

Name: Comet Road Bridges Replacement
Location: Juneau, AK
Owner: Coeur Alaska Inc. (Kensington Gold Mine) 
Engineer: R&M Engineering (PDC Engineers) 
Contractor: Alaska Aggregate Products 
Product: Two Modular Steel Bridges with Bolt-A-Bin Abutments
Application: Stream Crossing Replacements
First Bridge Dimensions: Length 65', Width 16'
Second Bridge Dimensions: Length 45', Width 16'
Installation Time: One week